welcome to al rehman builders

all you need to know on the state of art of construction

we strive for excellence

transparency and top class construction

superb steel work on foundation

articulate steel girders on plaza foundation

plaza foundation's steel work with precision

about us

Al Rehman Builders is a Construction business with a difference. The business is operated by Khawar Habib, its Chief Executive Officer, ably supported by Mohammad Saleem and Husnain Shahzad. The company started its business in 2009 and within a short span of 15 years has built super houses on 5, 10 marlas and 1, 2 kanal plots in Pakistan Town, PWD and Bahria Phase 1 to 8. The workforce comprise of qualified engineers and contractors in all fields.

The motto is transparency. It is never compromised. The clients are given all options ranging from labour rates, turn key projects and on fixed percentage basis. A special feature is the provision of videos and photographs of each and every stage of the development of the project. We have also built 4 to 6 storey plazas.

Clients may contact us on phone 03360511496, 03348324486 and 03025476068 and email khawar219@gmail.com. For details, visit www.yoursbuilder.com

Website Created by Nazia Khawar

our services

house renovation

We undertake to provide complete indoor and outdoor color work of the house as per client's desire. The cost of labor and material will be borne by the client in addition to service fee at the rate of 15% of the total cost

architecture design

We undertake to assist the client in the preparation of the conceptual design as well as complete architecture and working drawings of the house. The cost will be payable to the consultant

material supply

If the house is built on a turn key mode we would supply all material with service fee at the rate of 15% of the total cost of the material used in the house

On a labour rate mode, the client is required to provide all material as and when needed

interior design

An interior design consultant will be provided with service fee varying from 10% to 15% of the total cost of the consultant

building maintenance

We will provide minor maintenance of the house for 3 years after its completion free of cost

construction pictures

On specific demand of client, we provide a step by step pictures of the entire construction process right from marking of the plot, demarcation of house layout, excavation, till the finishing of the house. For this service we charge from 5% to 15% of the total cost accrued on the different construction categories

projects build by al rehman builders

excavation process

leveling of plot

preparation of termite treatment

partial lean of foundation-I

partial lean of foundation-II

laying of lean of underground tank

steel laying on foundation-I

steel laying on foundation-II

steel laying on foundation-III

steel laying of underground tank

steel laying with shuttering-I

steel laying with shuttering-II

steel laying with shuttering-III

steel laying with shuttering-IV

steel laying with beams on foundation

main sewerage lines-I

main sewerage lines-II

underground pipes for washroom-I

underground pipes for washroom-II

underground pipes for washroom-III

underground pipes for washroom-IV

underground pipes for washroom-V

termite treatment-I

termite treatment-II

termite treatment-III

partial structure upto lintern height


beautiful and elegant
elevation of houses

10 marla house

10 marla house

10 marla house

10 marla house

10 marla house

10 marla house

10 marla house

10 marla house

10 marla house

Multi storey plaza

10 marla house

10 marla house

10 marla house

Multi storey Plaza

10 marla house

10 marla house

10 marla house

10 marla house

1 kanal house

1 kanal house

1 kanal house

construction specifications and rates



1. Quality of Construction Classes (Normal, High, Very High)
2. Construction Categories and Rates (2024)
a) Structure
Labor Rate
Labor Rate with material

250-300 per sq.ft
1900-200 per sq,ft
b) Gray Structure
Labor Rate
Labor Rate with material

550-700 per sq.ft
2200-2500 per sq.ft
c) Turn Key
Normal
High
Very High

1500-2500
2500-4000
4000-6000
3. Details of Quality of Construction (2024)
a) Bricks Low cost 14/-, High Cost 17/-, Very high cost 19/-
b) Sand, Crush, Rori, Cement Same cost in all classes
c) Steel 265-274 per kg
d) Plumbing Same cost in all classes
e) Electrical
i) Lights and Chandlier
ii) Fans
iii) Switch Boards
iv) Power Plugs
Quality in classes
-do-
-do-
-do-
f) Kitchen and Bath Accessores
Hood, sink, vanity, commode,
bath accessories, bath set
Quality in classes
g) Grills Quality in classes
h) Main Gate -do-
i) False Ceiling Same cost in all classes
j) Aluminum windows, glasses
and railings
Quality in classes
k) Floor Tiles, terrace tiles,
marble for stairs
Quality in classes
l) Guarage Tiles Same cost in all classes
m) Termite treatment -do-
n) Paint Quality in classes
o) Wood Work
i) Type of wood
ii) Locks
iii) Handles
Quality in classes
-do-
-do-
4. Approximate Material/Labor cost in different size of houses (Normal class) (2024)
a) Material 5 Marla 10 Marla 1 kanal
b) Bricks 520500 10 Marla 1 kanal
c) Cement 1084860 184500 3025800
d) Rait 349650 800000 800000
e) Steel 1890000 2160000 4320000
f) Plumbing Material 440000 850000 1550000
g) Plumbing Labor 150000 200000 350000
h) Electric Material 70000 900000 1500000
i) Electric Labor 75000 95000 120000
j) Aluminum (M+L) 180000 288000 750000
k) Kitchen (M+L) 500000 700000 without lab 1000000 without lab
l) Safety Grills (M+L) 200000 350000 450000
m) Wood (M+L) 1000000 1500000 1500000 without lab
n) False Ceiling (M+L) 200000 500000 1000000 without lab
o) Paint (M+) 600000 1000000 1200000 without lab
p) Kitchen and bath 1000000 2000000 3000000
5. Approximate Covered Area of Houses
a) 5 Marla: 2000 sq.ft 10 Marla: 4000 sq.ft 1 Kanal: 6000 sq.ft
6. Building Material (Approximately)
a) Items 5 Marla 10 Marla 1 Kanal
b) Bricks 34700 55000 125700
c) Crush 6 dumpers 10 dumpers 12 dumpers
d) Cement 882 bags 1500 bags 2460 bags
e) Rait 7 dumpers 16 dumpers 17 dumpers
f) Steel 6 tons 9 tons 16 tons

materials used in construction

cement bags

pipe fittings

plumbing fittings

bathroom fittings

electric cables

main switch board