Al Rehman Builders is a Construction business with a difference. The business is operated by Khawar Habib, its Chief Executive Officer, ably supported by Mohammad Saleem and Husnain Shahzad. The company started its business in 2009 and within a short span of 15 years has built super houses on 5, 10 marlas and 1, 2 kanal plots in Pakistan Town, PWD and Bahria Phase 1 to 8. The workforce comprise of qualified engineers and contractors in all fields.
The motto is transparency. It is never compromised. The clients are given all options ranging from labour rates, turn key projects and on fixed percentage basis. A special feature is the provision of videos and photographs of each and every stage of the development of the project. We have also built 4 to 6 storey plazas.
Clients may contact us on phone 03360511496, 03348324486 and 03025476068 and email khawar219@gmail.com. For details, visit www.yoursbuilder.com
We undertake to provide complete indoor and outdoor color work of the house as per client's desire. The cost of labor and material will be borne by the client in addition to service fee at the rate of 15% of the total cost
We undertake to assist the client in the preparation of the conceptual design as well as complete architecture and working drawings of the house. The cost will be payable to the consultant
If the house is built on a turn key mode we would supply all material with service fee at the rate of 15% of the total cost of the material used in the house
On a labour rate mode, the client is required to provide all material as and when needed
An interior design consultant will be provided with service fee varying from 10% to 15% of the total cost of the consultant
We will provide minor maintenance of the house for 3 years after its completion free of cost
On specific demand of client, we provide a step by step pictures of the entire construction process right from marking of the plot, demarcation of house layout, excavation, till the finishing of the house. For this service we charge from 5% to 15% of the total cost accrued on the different construction categories
1. | Quality of Construction | Classes (Normal, High, Very High) | |||
2. | Construction Categories and Rates (2024) | ||||
a) | Structure Labor Rate Labor Rate with material |
250-300 per sq.ft 1900-200 per sq,ft |
|||
b) | Gray Structure Labor Rate Labor Rate with material |
550-700 per sq.ft 2200-2500 per sq.ft |
|||
c) | Turn Key Normal High Very High |
1500-2500 2500-4000 4000-6000 |
|||
3. | Details of Quality of Construction (2024) | ||||
a) | Bricks Low cost 14/-, High Cost 17/-, Very high cost 19/- | ||||
b) | Sand, Crush, Rori, Cement | Same cost in all classes | |||
c) | Steel | 265-274 per kg | |||
d) | Plumbing | Same cost in all classes | |||
e) | Electrical i) Lights and Chandlier ii) Fans iii) Switch Boards iv) Power Plugs |
Quality in classes -do- -do- -do- |
|||
f) | Kitchen and Bath Accessores Hood, sink, vanity, commode, bath accessories, bath set |
Quality in classes | |||
g) | Grills | Quality in classes | |||
h) | Main Gate | -do- | |||
i) | False Ceiling | Same cost in all classes | |||
j) | Aluminum windows, glasses and railings |
Quality in classes | |||
k) | Floor Tiles, terrace tiles, marble for stairs |
Quality in classes | |||
l) | Guarage Tiles | Same cost in all classes | |||
m) | Termite treatment | -do- | |||
n) | Paint | Quality in classes | |||
o) | Wood Work i) Type of wood ii) Locks iii) Handles |
Quality in classes -do- -do- |
|||
4. | Approximate Material/Labor cost in different size of houses (Normal class) (2024) | ||||
a) | Material | 5 Marla | 10 Marla | 1 kanal | |
b) | Bricks | 520500 | 10 Marla | 1 kanal | |
c) | Cement | 1084860 | 184500 | 3025800 | |
d) | Rait | 349650 | 800000 | 800000 | |
e) | Steel | 1890000 | 2160000 | 4320000 | |
f) | Plumbing Material | 440000 | 850000 | 1550000 | |
g) | Plumbing Labor | 150000 | 200000 | 350000 | |
h) | Electric Material | 70000 | 900000 | 1500000 | |
i) | Electric Labor | 75000 | 95000 | 120000 | |
j) | Aluminum (M+L) | 180000 | 288000 | 750000 | |
k) | Kitchen (M+L) | 500000 | 700000 without lab | 1000000 without lab | |
l) | Safety Grills (M+L) | 200000 | 350000 | 450000 | |
m) | Wood (M+L) | 1000000 | 1500000 | 1500000 without lab | |
n) | False Ceiling (M+L) | 200000 | 500000 | 1000000 without lab | |
o) | Paint (M+) | 600000 | 1000000 | 1200000 without lab | |
p) | Kitchen and bath | 1000000 | 2000000 | 3000000 | |
5. | Approximate Covered Area of Houses | ||||
a) | 5 Marla: 2000 sq.ft | 10 Marla: 4000 sq.ft | 1 Kanal: 6000 sq.ft | ||
6. | Building Material (Approximately) | ||||
a) | Items | 5 Marla | 10 Marla | 1 Kanal | |
b) | Bricks | 34700 | 55000 | 125700 | |
c) | Crush | 6 dumpers | 10 dumpers | 12 dumpers | |
d) | Cement | 882 bags | 1500 bags | 2460 bags | |
e) | Rait | 7 dumpers | 16 dumpers | 17 dumpers | |
f) | Steel | 6 tons | 9 tons | 16 tons |